Subscribe!
770-267-8371
Thursday
September 2, 2010
Advanced | Browse | Help
Register | Sign In | Subscribe
Marketplace
Sections
Service Center

Invitation to Bid
Displaying 1 ads in this category

NOTICE OF LOCATION AND DESIGN APPROVAL

PROJECT BRST0-0061-01(110) WALTON COUNTY
P. I. NUMBER 132982

Notice is hereby given in compliance with Georgia Code 22-2-109 that the Georgia Department of Transportation has approved the Location and Design of this project.

The date of location approval is 08/11/10.

The project consists of the replacement of the existing westbound bridge and new roadway approaches on SR 10/US 78 over the Apalachee River at the Walton County and Oconee County lines. The total length of project is 0.66 miles, beginning at mile log 20.88 in Walton County and ending at mile log 0.32 in Oconee County. The project is within Land Lots 253 and 255, 3rd District, GMD 454 Walton County, Georgia, and GMD 224, Oconee County, Georgia.

The construction will consist replacing the existing westbound bridge with a new bridge to the outside of the existing travel lanes. The existing bridge will remain in place and the westbound lanes will be shifted onto the proposed bridge. The existing bridge is approximately 418' long and 26.7' wide and is in need of replacement. The proposed bridge is approximately 420' long and is 36' wide (gutter to gutter). The proposed roadway width is 24' with rural shoulders of 10', 6'-6” of which will be paved.
Drawings or maps or plats of the proposed project, as approved, are on file and are available for public inspection at the Georgia Department of Transportation:

Johnny Emmett
JEmmett@dot.ga.gov
450 Old Hull Road
Athens, Georgia 30601
706-583-2644

Any interested party may obtain a copy of the drawings or maps or plats or portions thereof by paying a nominal fee and requesting in writing to:

Derrick Brown
Assistant Project Manager
Office of Program Delivery
dbrown@dot.ga.gov
One Georgia Center
600 W. Peachtree Street NW, 25th Floor
Atlanta, Georgia 30308
404-631-1571

Any written request or communication in reference to this project or notice SHOULD include the Project and P. I. Numbers as noted at the top of this notice.
1767

Published September 1, 2010

Save this ad.


 
 

 


Celebrating a Second Century of Service

Home | Subscribe | About Us | Mobile News
Classifieds | Write a Letter | Site Help

Publisher: David Clemons

124 North Broad
Monroe, Georgia 30655

Tel: 770-267-8371 | Email

© 2010 The Walton Tribune. All rights reserved.

A Southern Newspapers publication.

back to top